Vertical bitumen storage tank

For IVC we took the challenge to produce a labor-intensive storage tank in 8 weeks starting from design to installation.

The tank is equipped with an external 300m half-coil and an internal coil that warms up the tank to a temperature of 200°C. The tank will melt bitumen product which will be transported direct to the machines. Insulation works took place on site.